Mumbai LTT Ernakulam AC Duronto Express (12223) Train Schedule

Lokmanya Tilak Terminus to Ernakulam Junction (South)
Type: Duronto Rake
Zone: CR/Central
Travel Time: 21h 0m      5 halts
Distance: 1292 km
Avg Speed: 62 km/hr

Running days:
TUESAT
Pantry/Catering
Pantry Car Avbl
Catering Avbl
E-Catering Avbl
Runs on TUE SAT
Classes 1A,2A,3A
Type Duronto Rake
Zone CR/Central
Travel Time: 21h 0m , Distance: 1292 km , Avg Speed: 62 km/hr
Pantry Car Avbl Catering Avbl E-Catering Avbl

Coach Position Of Train Mumbai LTT Ernakulam AC Duronto Express - 12223

Mumbai LTT Ernakulam AC Duronto Express ( 12223 ) has 15 coaches having different classes are shown in correct order. Please check your coach before journey so that you do not face any problem locating your coach on the date of journey.

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
L EOG B8 B7 B6 B5 B4 B3 B2 B1 PC H1 A2 A1 EOG

Mumbai LTT Ernakulam AC Duronto Express ( 12223 ) has 15 coaches having different classes are shown in correct order. Please check your coach before journey so that you do not face any problem locating your coach on the date of journey.

ENGINE EOG B8 B7 B6 B5 B4 B3 B2 B1 PC H1 A2 A1 EOG

Time Table of Mumbai LTT Ernakulam AC Duronto Express-12223

The table below shows the time schedule of Mumbai LTT Ernakulam AC Duronto Express (12223) . Timing of Mumbai LTT Ernakulam AC Duronto Express train along with its arrival , departure time and halt time at each station is given below. The distance column shows the distance in K/m traveled by the train from its starting point i.e.., Lokmanya Tilak Terminus

Station Arrival
Departure
Day PF Halt Distance (K/m)
Lokmanya Tilak Terminus
(LTT)
origin
20:50
040
Ratnagiri
(RN)
01:55
02:00
115m327.7
Madgaon Junction
(MAO)
05:45
05:55
1110m563.7
Kozhikode Main (Calicut)
(CLT)
13:45
13:50
145m1099.2
Shoranur Junction
(SRR)
15:15
15:20
15m1185.4
Ernakulam Junction (South)
(ERS)
17:50
destination
141292.5

Mumbai LTT Ernakulam AC Duronto Express (12223) is a Duronto Rake starts from Lokmanya Tilak Terminus station and runs upto Ernakulam Junction (South) .It runs on ,TUESDAY ,SATURDAY .

It covers total journey of 1292 km and reaches its destination on day 1. Mumbai LTT Ernakulam AC Duronto Express-12223 departs from Ratnagiri at 02:00 and arrives Ernakulam Junction (South) at 17:50 on day 1.

12223 Mumbai LTT Ernakulam AC Duronto Express has total 5 stopping stations in its route including both source and destination stations.