Mumbai LTT Secunderabad AC Duronto Express (12219) Train Schedule

Lokmanya Tilak Terminus to Secunderabad Junction
Type: Duronto Rake
Zone: SCR/South Central
Travel Time: 12h 0m      5 halts
Distance: 769 km
Avg Speed: 64 km/hr

Running days:
WEDSAT
Pantry/Catering
Pantry Car Avbl
Catering Avbl
E-Catering Avbl
Runs on WED SAT
Classes 1A,2A,3A
Type Duronto Rake
Zone SCR/South Central
Travel Time: 12h 0m , Distance: 769 km , Avg Speed: 64 km/hr
Pantry Car Avbl Catering Avbl E-Catering Avbl

Coach Position Of Train Mumbai LTT Secunderabad AC Duronto Express - 12219

Mumbai LTT Secunderabad AC Duronto Express ( 12219 ) has 18 coaches having different classes are shown in correct order. Please check your coach before journey so that you do not face any problem locating your coach on the date of journey.

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
L EOG A3 A2 A1 H1 PC B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 EOG

Mumbai LTT Secunderabad AC Duronto Express ( 12219 ) has 18 coaches having different classes are shown in correct order. Please check your coach before journey so that you do not face any problem locating your coach on the date of journey.

ENGINE EOG A3 A2 A1 H1 PC B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 EOG

Time Table of Mumbai LTT Secunderabad AC Duronto Express-12219

The table below shows the time schedule of Mumbai LTT Secunderabad AC Duronto Express (12219) . Timing of Mumbai LTT Secunderabad AC Duronto Express train along with its arrival , departure time and halt time at each station is given below. The distance column shows the distance in K/m traveled by the train from its starting point i.e.., Lokmanya Tilak Terminus

Station Arrival
Departure
Day PF Halt Distance (K/m)
Lokmanya Tilak Terminus
(LTT)
origin
23:05
020
Karjat Junction
(KJT)
00:27
00:30
113m81.2
Lonavala
(LNL)
01:05
01:08
13m109.1
Solapur
(SUR)
05:57
06:00
13m435.1
Wadi Junction
(WADI)
08:05
08:10
15m584.9
Secunderabad Junction
(SC)
11:05
destination
17769.1

Mumbai LTT Secunderabad AC Duronto Express (12219) is a Duronto Rake starts from Lokmanya Tilak Terminus station and runs upto Secunderabad Junction .It runs on ,WEDNESDAY ,SATURDAY .

It covers total journey of 769 km and reaches its destination on day 1. Mumbai LTT Secunderabad AC Duronto Express-12219 departs from Karjat Junction at 00:30 and arrives Secunderabad Junction at 11:05 on day 1.

12219 Mumbai LTT Secunderabad AC Duronto Express has total 5 stopping stations in its route including both source and destination stations.